Skip to content

Coal-fired thermal power plant, Chittagong

Feasibility study and environmental impact assessment for an IPP led by a Korean EPC.

Capacity1.3 GW
TechnologyCoal
StageFeasibility
CounterpartyIPP — POSCO E&C, Korea
LocationChittagong, Bangladesh
RoleElectrical Engineer
Year2016
1,320 MWFS and EIA
A full case study for this project is in preparation.
07 / Contact

Tell me the technology, the capacity, and where you're stuck.