Skip to content

USC coal-fired power plant, Patuakhali

Pre-feasibility study and initial environmental examination for an ultra-supercritical plant.

Capacity1.3 GW
TechnologyCoal
StageFeasibility
CounterpartyNWPGCL
LocationPatuakhali, Bangladesh
RoleElectrical Engineer
Year2014
1,320 MWPre-FS and IEE
A full case study for this project is in preparation.
07 / Contact

Tell me the technology, the capacity, and where you're stuck.