Skip to content

Coal-fired thermal power plant, Gazaria

Detailed feasibility study with IEE, EIA and social impact assessment.

Capacity350 MW
TechnologyCoal
StageFeasibility
CounterpartyRPCL
LocationMunshiganj, Bangladesh
RoleElectrical Engineer
Year2016
350 MW (+10%)FS · IEE · EIA · SIA
A full case study for this project is in preparation.
07 / Contact

Tell me the technology, the capacity, and where you're stuck.