Skip to content

Grid-tied solar plant, Tetulia

Early-stage development and construction supervision for a 9.6 MWac plant — investor due diligence, RFPs, EPC offer evaluation, and ESG and EHS compliance reporting.

Capacity9.6 MW
TechnologySolar PV
StageOperational
CounterpartySymbior Solar Bangladesh Limited
LocationTetulia, Panchagarh, Bangladesh
RoleRenewable Energy Consultant
Year2018
9.6 MWacCommissioned
A full case study for this project is in preparation.
07 / Contact

Tell me the technology, the capacity, and where you're stuck.