Skip to content

2 × 100 MW grid-tied solar

Two 100 MW grid-tied PV plants developed for a domestic industrial group.

Capacity200 MW
TechnologySolar PV
StageDevelopment
CounterpartyHosaf Group
LocationBangladesh
RoleIndependent Consultant
Year2023
2 × 100 MW
A full case study for this project is in preparation.
07 / Contact

Tell me the technology, the capacity, and where you're stuck.